Friday, March 20, 2015

Update from Aurora 41LN17

WX here has been cold. I am shutting hatches down to sit on the dogs after dark and sleeping under a light blanket. Really miserable. I have been looking for the photos of Aurora, taken 3-4 years ago in Beaufort, NC. One has a ruler buried 7" deep in the snow on the cockpit table. The others only add to the ambiance. We swore then NEVER AGAIN!

Ted
S/Y AURORA
Lying Prickly Bay, Grenada, West Indies

(473) 456-7418 (Grenada)

Meet Mike and Linda Wiens, FairWind 41LN10

Mike and Linda (and puppy Riley) have owned FairWind for seven years. Mike and Linda met in college. He had just graduated and she was a cute sophomore. Together they built a successful heating and air conditioning business. Along the way two children, a son and a daughter, came along. Good thing, the kids now run the business while Mike and Linda play. And these two know how to play; if they're not sailing FairWind then they're flying their Bonanza. Mike is an FAA certified flight instructor (CFII).  Until recently they were strictly Lake Erie sailors. That all changed in October 2014 when they cruised FairWind south to her new home in Punta Gorda, Florida. Their humorous blog, svfairwind.tumblr.com, documents all the highs and lows of the trip.

Before leaving Ohio they completed a two year refit on FairWind. Mike said the teak deck was beyond saving so it was removed and nonskid put down. Not all the wood deck is gone though. New teak was put in all the cabin-top pads. New chainplates and standing rigging was installed too. When removing the hawse cleats Mike said he broke many of the bronze sex bolts. He was unable to find a source and so a machine shop made them for $10 each. The bulwark scuppers were rebuilt as the fiberglass inside the scupper wasn't well connected to either the hull or the deck--a common problem on Lord Nelson boats. While repairing the scuppers Mike found that his bulwark is filled with sand impregnated polyester resin. Almost everything on FairWind's deck was re-bedded. Happily this eliminated all the deck leaks. During construction Hai-O laminated stainless backing plates into the cabin top beneath the traveler. The plates were drilled and tapped for the traveler's machine screw fasteners. Mike said he found several instances of this construction technique. Last, but not least, the entire hull and topsides were painted.

By Dave Howell
Nellie D. 37VT63

Saturday, February 28, 2015

Embla's Pending, East to West Atlantic Crossing

I am currently lying Vigo, Spain waiting for a front to pass and for northerly winds to set in. Sometime this week, I will set sail for the Canary Islands with a local Spanish crew member. I plan to cross the Atlantic in May, to arrive before Hurricane season. If all goes well, we will have Embla in the Chesapeake this Summer. 

- Donald Dorn-Lopez
S/V Embla - 41LN14

BMW D50 Parts for the Asking

I recently re-powered during a major overhaul and now have to find a home for the old BMW. I would hate to see my running BMW D50 go to waste but there doesn't seem to be a high demand for this engine amongst the general public. I know most parts can generally be obtained from Canada but, from personal experience, I know they're not cheap. Seems like every time I ordered a part it was $500. Looking at pictures on the owner's association there appears to be at least six owners with their original BMW engine. If anyone is interested in obtaining an entire spare engine/transmisson in order to keep their Beemer running please contact me. I don't want it to go to waste and I need my garage space back. Its not about the money. Although its still listed for sale on Craigslist for the general public, for a Lord Nelson owner it will be "free to good home". You just need to figure out how to pick it up or ship it from Gulf Breeze, Florida.

Tom Fish, Voodoo Child 41LN23

Embla 41LN14's Chainplate Upgrades



I improved the chainplate mounts, by adding a fiberglass base to get the joint up out of the water channel and then welded on a stainless base (Hallberg Rassy style) to give further protection from leaks. I also learned that they must be sealed with butyl rubber and not polyurethane sealant! This is important. By the way, all of the chainplates were severly corroded in places where you cannot see it. Now all of them are new and all of the bolts are new.

The problem with polyurethane sealant (I used Sika Flex 291i, but am pretty sure the others are the same), is that it does not elongate as much as advertised before failing. The Sika technical sheet says it will take 300% elongation (tension) before failure. I planned a joint thickness of 3 mm, in order to allow for up to 9 mm of possible movement, an important consideration since the rig pulls upward on the chain plates. I found that the sealant failed with less than 2 mm of stretch. I did clean well with Sika cleaner and I used the recommended primer, so am pretty sure it was not a failure in the preparation. Besides, all 6 chain plate joints failed and leaked. 

The product that I switched to is "Bed-It Butyl Tape" (www.pbase.com/mainecruising/butyl_tape), and it works very well. Problem solved, no leaks.  By the way, I am now using "Bed-It" for many other leak sealing issues. The original sealant used on the Lord Nelson's is a black, gooey substance that remains pliable even after 30 years. It smells like it is a type of poly sulfide, which would probably also work. The best poly sulfide I have used is 3M 101, but I haven't seen it sold for many years. I think it can still be ordered from Jamestown Distributors.

Donald Dorn-Lopez, ddl001@gmail.com

Thursday, February 26, 2015

Deferred Maintenance

Yes, the fiddle rail does come off. It is still in one piece. All this for failing to keep the seal between the marble and the bulkhead.






Saturday, February 14, 2015

Head Vanity Leaks

From: Ted Boodry tedntex@yahoo.com

Anyone else not keeping up with the caulking on the counter behind the mirror?











Ted
S/Y AURORA
(469) 212-6778 USA
(473) 456-7418 Grenada
Tedntex@yahoo.com